<br><font size=2 face="Arial">Participants:</font>
<br><font size=2 face="sans-serif">Claudia Alimpich (IBM)</font>
<br><font size=2 face="sans-serif">Ira McDonald (High North Inc.)</font>
<br><font size=2 face="sans-serif">Norm Jacobs (Sun)</font>
<br><font size=2 face="sans-serif">Till Kamppeter (Till Kamppeter)</font>
<br>
<br><font size=2 face="sans-serif">We talked about the OSDL Printing Summit
to be held in Atlanta 4/10-4/12.</font>
<br>
<br><font size=2 face="sans-serif">Ira will request a time slot for Norm
to present an overview of FSG projects.</font>
<br>
<br><font size=2 face="sans-serif">We need to create slides to present
during the OSDL Printing Summit.</font>
<br>
<br><font size=2 face="sans-serif">Ira will put together an outline of
the 6-8 slides for the OSDL Printing Summit describing the FSG projects.
</font>
<br>
<br><font size=2 face="sans-serif">Monday 3/13 - FSG Steering committee
will review Ira's outline.</font>
<br>
<br><font size=2 face="sans-serif">Wednesday 3/15 - FSG Arch working group
will create the actual slides from Ira's outline.</font>
<br>
<br><font size=2 face="sans-serif">Wednesday 3/22 - FSG Arch working group
meeting is cancelled.</font>
<br>
<br><font size=2 face="sans-serif">Wednesday 3/29 - If needed, FSG Arch
working group will finish up the slides.</font>
<br>
<br><font size=2 face="sans-serif">Monday 4/3 - FSG Steering committee
will the review slides.</font>
<br>
<br><font size=2 face="sans-serif">Wednesday 4/5 - FSG Arch working gorup
will perform last review of slides.</font>
<br>
<br><font size=2 face="sans-serif">Please update your calendars to reflect
the above schedule changes.</font>
<br>
<br><font size=2 face="sans-serif">Claudia</font>